Mukilteo's Baseline
Mukilteo is a Tier 3 city (2020 population about 21,500). Under state law the city must permit at least 2 homes on each residential lot within the urban growth area. The Sounder station counts as a major transit stop, so no off-street parking can be required for middle housing within a half-mile walk of it — but the state's higher unit minimums near transit apply only in Tier 1 and Tier 2 cities.
Building on Bluffs and Ravines
We price these items during feasibility, not after design.
Paine Field and Other Overlays
Parts of Mukilteo lie under the approach and departure paths for Paine Field. Depending on location, projects may face noise-insulation standards, height limits or disclosure requirements. We check overlays for every parcel.
Projects That Suit Mukilteo
- Stacked duplexes on view lots — each floor gets a full-width view.
- Owner-occupied duplexes with a main home above and a rental below, using a daylight slope.
- Single custom infill homes on difficult lots where two units would require too much structural cost.
Mukilteo FAQ
QIs a sloped Mukilteo lot too expensive to develop?
Not necessarily. Slopes add foundation and drainage cost but often create a daylight level — effectively a second unit — that offsets it.
QWill the ferry terminal count as transit?
No. Washington ferry terminals were removed from the definition of a major transit stop for middle housing purposes.


