Short answer

A middle housing project costs the land plus four main groups — site work and utilities, design and fees, construction, and financing with contingency. Construction is the biggest single line, but site and fee costs decide whether a small project pencils out.

Stacked lumber seen end onLumber
Workers raising wood framing on a siteFraming
Calculator, coins and banknotes on a deskBudget
01

The Cost Stack

GroupWhat it includesHow to control it
LandPurchase price or current land valueAlready fixed if you own the lot
Demolition & abatementHazmat survey, asbestos removal, demolition, disposalSurvey early; salvage where possible
Site work & utilitiesExcavation, grading, retaining walls, stormwater, side sewer, water meters, powerChoose a layout that follows the grade and keeps utility runs short
Design & engineeringArchitect, civil, structural, geotech, survey, arboristCommit to a building type before full design
Permits & feesPlan review, building and site permits, school/park/traffic impact fees, utility connection chargesModel fees per city before buying land
ConstructionFoundations, framing, envelope, MEP, finishesRepeat floor plans across units; avoid complex roofs
Financing & contingencyLoan interest, points, insurance, contingency reserveShorten permitting time; keep 8–10% contingency
02

Why Two Homes Cost More Than Half of Four

Many costs are fixed per project: the survey, the civil design, the side sewer, the pre-application meeting, the street frontage. Spread across two homes, they are heavy; across four or six, they shrink per unit. That is why lots that allow four homes often produce a better return than lots limited to two, even after the extra construction.

03

The Code Threshold

Duplexes and townhouses are usually built under the residential code. Three or more stacked homes generally trigger the commercial building code, with fire sprinklers, more fire-rated assemblies and, at four or more units, Fair Housing Act accessibility. Expect a noticeable cost-per-square-foot jump at that line — sometimes enough to make townhomes cheaper per home than a fourplex.

04

Fees Vary More Than People Expect

Impact fees are set by each city and school district, and utility connection charges by each water and sewer provider. Two lots a mile apart, one in Lynnwood and one in unincorporated Snohomish County, can carry very different fee totals. We pull current fee schedules for every feasibility package.

05

Finishes: Rental Grade vs. Owner Grade

ItemRental standardOwner/market standard
FlooringLuxury vinyl plank throughoutLVP or engineered wood, tile in baths
CountersQuartz, standard edgeQuartz with full-height backsplash
CabinetsStockSemi-custom
FixturesDurable mid-rangeUpgraded fixtures, tiled shower
ExteriorFiber cement lapMixed cladding, wood accents

The gap between columns typically adds 15–25% to construction cost.

06

Estimate Your Own Project

Use the calculator to model your lot with editable assumptions → Build Cost & Return Calculator