Lot Feasibility Checklist: 12 Things to Check Before Design

Short answer

Zoning tells you how many homes are allowed; the site tells you how many actually fit. Check these twelve items, roughly in this order, before you pay for full design.

Surveying tripod in a green fieldSurvey
Tall pine trees seen from belowTrees on the lot
Houses on a steep wooded hillside above a townSloped lot
01

The Checklist

  1. 01
    Jurisdiction
    Confirm the parcel is inside city limits, not unincorporated county land, on the county assessor's site.
  2. 02
    Zone and city tier
    Look up the zoning designation and the city's middle housing rules.
  3. 03
    Walking distance to major transit
    A quarter-mile walk can double the minimum in Tier 1 and 2 cities; a half-mile walk removes parking requirements in every tier.
  4. 04
    Sewer
    Is the lot connected? Where is the main, how deep is it, and does the new layout drain to it by gravity?
  5. 05
    Water and fire flow
    Is the water main large enough for additional meters and, for multiplexes, fire sprinklers?
  6. 06
    Power
    Can the utility serve multiple meters from the existing transformer, or is an upgrade needed?
  7. 07
    Slopes and geology
    Mapped steep slopes or landslide hazards trigger geotechnical work.
  8. 08
    Wetlands and streams
    Buffers can remove a large share of buildable area.
  9. 09
    Trees
    Significant trees, their root zones and the city's retention requirements.
  10. 10
    Access
    Lot width, driveway location, alley availability and fire department access distances.
  11. 11
    Title
    Easements, covenants, HOA rules and any recorded restrictions on dwellings per lot.
  12. 12
    Frontage and fees
    Required sidewalk, curb or street trees, plus impact and connection fees.
02

Red Flags That Usually End a Project

  • Sewer more than a few hundred feet away with no planned extension
  • A wetland or stream buffer covering most of the lot
  • A recorded covenant limiting the lot to one dwelling, with an HOA that enforces it
  • A flag lot with an access strip too narrow for required fire access
03

Yellow Flags That Add Cost but Rarely Stop a Project

  • Moderate slope requiring retaining walls
  • An old side sewer needing replacement
  • Several significant trees in the building zone
  • A required frontage improvement
04

Get the Checklist Done for You

Our free lot review covers items 1–3 and a first look at 4–12. The paid feasibility package completes all twelve with utility letters and site plans. → Feasibility, Design & Permits

Free lot review

Send us the address. Within two business days you get a written lot review: how many units the city allows, what the site will cost to prepare, and which housing type makes the most sense for your goals.

Get a Lot Review Call (425) 555-0164