01
The Checklist
- 01JurisdictionConfirm the parcel is inside city limits, not unincorporated county land, on the county assessor's site.
- 02Zone and city tierLook up the zoning designation and the city's middle housing rules.
- 03Walking distance to major transitA quarter-mile walk can double the minimum in Tier 1 and 2 cities; a half-mile walk removes parking requirements in every tier.
- 04SewerIs the lot connected? Where is the main, how deep is it, and does the new layout drain to it by gravity?
- 05Water and fire flowIs the water main large enough for additional meters and, for multiplexes, fire sprinklers?
- 06PowerCan the utility serve multiple meters from the existing transformer, or is an upgrade needed?
- 07Slopes and geologyMapped steep slopes or landslide hazards trigger geotechnical work.
- 08Wetlands and streamsBuffers can remove a large share of buildable area.
- 09TreesSignificant trees, their root zones and the city's retention requirements.
- 10AccessLot width, driveway location, alley availability and fire department access distances.
- 11TitleEasements, covenants, HOA rules and any recorded restrictions on dwellings per lot.
- 12Frontage and feesRequired sidewalk, curb or street trees, plus impact and connection fees.
02
Red Flags That Usually End a Project
- Sewer more than a few hundred feet away with no planned extension
- A wetland or stream buffer covering most of the lot
- A recorded covenant limiting the lot to one dwelling, with an HOA that enforces it
- A flag lot with an access strip too narrow for required fire access
03
Yellow Flags That Add Cost but Rarely Stop a Project
- Moderate slope requiring retaining walls
- An old side sewer needing replacement
- Several significant trees in the building zone
- A required frontage improvement
04
Get the Checklist Done for You
Our free lot review covers items 1–3 and a first look at 4–12. The paid feasibility package completes all twelve with utility letters and site plans. → Feasibility, Design & Permits